For builders and project managers
Screed becomes a finishing trade.
Time, cost, safety and quality all collide at the finishing stage. Pumped screed takes the pressure off all four: no pallets in the hoist, no stockpiles on the floor plate, no hand mixing, and the same specified mix in every load.
The program, back.
Bagged screed has to go in before the door frames, because a pallet won't fit through a finished doorway. Pumped screed goes through the doorway at the back of the program, in a day.
- TimeFloors screeded in a day, scheduled where a finishing trade belongs.
- SpaceNo pallets, stockpiles or mixers. The hoist and crane stay free for everyone else.
- SafetyNo silica dust from tipping bags, far less manual handling, inducted and licensed operators, safe work method statements for every pour.
- QualityComputer-batched to the specification, certified daily.
- ScaleOne supplier in Sydney, Melbourne, Brisbane and Perth.
On site the truck needs a firm place to park, 17 m to operate in, and a dedicated potable water tap.
A partner for your installers too
Most of our work reaches site through the flooring contractor. We plan pours with them, run the truck while they lay, and can recommend installers we trust when you need one.
Get ScreedPro on the program.
A truck, a date and a floor that turns up on time, for the next job and the four after it.
